Hosting in Ethiopia offers one of the lowest electricity prices for cryptocurrency mining, which allows maximize profits even with larger mining volumes.
🔹 Key features:
✅ Cheapest electricity – only 1,20 CZK/kWh excluding VAT
✅ Free housing – no monthly fees
✅ Quick installation – 10–25 days from delivery ASICu
✅ Wide range support ASIC miners - Bitmain Antminer L9, L7, K7, S21, S19K PRO, WhatsMiner
✅ Transport – 380 CZK/kg
✅ Prepaid electricity option – flexible prepayment or automatic deduction from mining balance
✅ Free capacity – 3 kW of power
✅ Optimized infrastructure – adapted for low operating costs
📌 Detailed description:
Ethiopia is among cheapest locations for hosting mining equipment, thanks to unbeatable electricity price (1,20 CZK/kWh excluding VAT)This advantage makes Ethiopia ideal choice for minerswho want minimize operating costs and maximize profitability.
Alone miner housing is free, clients only pay installation ASIC miner (2 CZK/kW)Installation in progress within 10–25 days, depending on logistical conditions.
This location is suitable for mining with Bitmain Antminer L9, L7, K7, S21, S19K PRO and WhatsMiner, and available capacity is 3 kW.
However, logistics can be a challenge - more complex customs processes a less developed transport infrastructure may extend delivery times. However, our partner network is working to optimize these processes to get the miner up and running as quickly as possible.
System flexible electricity payments allows clients to manage costs according to their own needs. Electricity can be pay in advance as credit, or can be used automatic deduction from mining balance according to the current exchange rate.
The transportation of equipment to Ethiopia is based on 380 CZK/kg, with the infrastructure adapted for efficient operation and long-term stability of mining.
Díky extremely low electricity costs a free housing is Ethiopia one of the most convenient destinations for cryptocurrency mining, despite the challenges associated with logistics.